Skip to main content
ACCOMPLISHED PROJECTS

ACCOMPLISHED PROJECTS

 ACCOMPLISHED PROJECTS FOR Al-FAO GENERAL ENGINEERING COMPANY

No. Project Name Accomplished Date Governorate  Cost (I.D)
1 Al- Roumaitha Bridge 2004 AL-Muthanna 252.174.000
2 Reconstruction Of The Company Head Office 2004 Baghdad 788.414.157
3 Rehabilitation Of  The Ministry Stores In Alamiryah 2005 Baghdad 174.468.042
4 Talafar Water Station – Unified Zummar (1st Stage) 2005 Nineveh 6.066.351.000  
5 Water Injection – West Of  Qurna (4th Stage) 2005 AL-Basra 827.751.240
6 Rehabilitation Of  Baghdad Touristic Island 2005 Baghdad 767.375.000
7 The Building Of  The Administration Of Babil Sewerage Network 2006 Babil 461.841.620
8 The Second Passage Bridges To AL-Khalis-AL-Adhaim Highway 2006 Diyala 1.479.823.668
9 Petroleum Products Building 2007 Maysan 805.500.000
10 Design Drawings For Ibn-Albaladi Hospital 2007 Baghdad 102.900.000
11 Consultations To Al-Najaf  Hospital 2007 Holy Najaf 200.000.000
12 Water Pipe Line Of Ain - AL-Tamer Province 2007 Sacred Karbala 1.351.600.000
13 Manufacturing Of Caravans 2007 Baghdad 61.600.000
14 Schools Building 2008 All Governorates 47.428.945.070
15 Head Office Building For The General Commission For Taxes 2008 Al-Diwaniyah 722.154.332
16 Traffic Control Buildings 2008 Babil 1.611.925.746
17 AL Sarrafya Truss Bridge Reconstruction 2008 Baghdad 13.000.000.000
18 Rehabilitation Of  Measurement And Quality Control Laboratories 2008 Baghdad 145.889.000
19 Rehabilitation Of  Measurement And Quality Control Service Building 2008 Baghdad 115.443.315
20 The Installation Of  First Floor In The Training Building 2008 Baghdad 453.550.000
21 Rehabilitation Of  Arar Buildings Complex Border Outlet 2008 AL-Anbar + Sacred Karbala 4.110.394.661
22 Hilla Gas Turbine Power Station Building 2008 Babil 4.364.150.500
23 Ministry Of Construction & Housing \ Head Office Building 2008 Holy Najaf 2.954.111.503
24 Grains Silo Expansion 2008 AL-Anbar 4.416.154.293
25 Electric Power Transmission Administration Building 2008 Baghdad 2.313.838.000
26 Improvement Of Crude Oil Discharging site 2008 Baghdad 831.762.500
27 Improvement Of  The Main Road In Hindiya 2009 Babil 1.408.866.400
28 The Maintenance Of  Chalt , AL-Teeb , Border Line 2009 Maysan 1.872.025.000
29 Execution Of  Exterior Pipe Line With Capacity (70.000) Burrels In AL-Doora Refinery 2009 Baghdad 4.674.855.000
30 Treatment Of  The Third Chimney In AL-Doora Electrical Power Station 2009 Baghdad 350.000.000
31 Treatment Of  The Fourth Chimney In AL-Doora Electrical Power Station 2009 Baghdad 300.000.000
32 The Work Includes Installing Electrical Elevator And The Treatment Of  The Third Chimney From Level (20m Up To 100m) In  AL-Doora Electrical Power Station 2009 Baghdad 375.000.000
33 The Execution Of Weight Bridge With (75) Ton Capacity In Beejy 2009 Salah AL-Din 98.963.600
34 The Laying Of Cooling Tube (16) Inch In AL-Doora Refinery 2009 Baghdad 117.698.000
35 Execution The Residual Work In Scholastic Buildings 2009 AL-Anbar +  AL-Diwania 3.438.075.072
36 Replacing The Re-Heat Coils For The Fourth Chimney In AL-Doora Electrical Power Station 2009 Baghdad 850.000.000
37 Executing A Third Floor For The Civilian Defense General Head Quarters 2009 Baghdad 1.385.979.000
38 Talafar Water Station – Unified Zummar (2st Stage) 2009 Nineveh 45.203.116.555
39 Supplying The Imported Equipments For The Project Of  Tellafor - Zummar Unified - Second Stage 2009 Nineveh 22.634.195.136
40  Digging And Reclamation Company - AL-Burjisiya 2009 AL-Basra 1.885.779.000
41 Improvement Of  Al_Hindiya City Nearby Babylon Governorate 2009 Babil 3.972.232.000
42 Installation Of The South Head Quarter Building - AL-Burjisiya 2009 AL-Basra 2.648.690.000
43 Installation Of  AL-Fao Oil Storage  Building 2009 AL-Basra 1.657.610.600
44 Beji Refineries Company Gates 2009 Salah AL-Din 937.605.000
45 Execution The Capacity Of Storage In AL-Risafa Gas Factory 2010 Baghdad 658.710.762
46 Execution Of Concrete Baes For AL-Kufa Cement Factory 2010 Holy Najaf 3.211.628.056
47 The Execution Of Infrastructure For Thee-Qar University (2 th Stage) 2010 Dhi-Qar 3.212.591.000
48 The Civil And Mechanical Works For The Pipes Of Second Refinery Unit In AL-Dora 2010 Baghdad 3.023.763.500
49 The Civil And Mechanical Works For The Cooling  Pipes Of Second Refinery Unit In AL-Dora 2010 Baghdad 1.630.067.000
50 Measurement And Quality Control 2010 Baghdad 3.336.217.500
51 Execution The Residual Work In Scholastic Buildings  2010 Maysan 5.330.499.330
52 The Treatment Of  The Settlement Of  AL-Clinker Conveyor For The First Line Of  Kerbalaa Cement Factory 2010 Sacred Karbala 96.912.000
53 Execution of closed sport hall (500) audiences [Al- gadwal al-gharbi , al-hussainiya , al-mahaweel , al-hendiya] 2010 Sacred Karbala + Babil 6.241.187.500
54 Execution Of The Third Stage Of AL-Bergisiyah Head Quarters 2010 AL-Basra 2.377.910.000
55 Install The Steam Boiler In Kirkuk Refinery 2010 Kirkuk 597.550.000
56 Execution Of Sewage Network In AL-Naft-District / Beiji 2010 Salah AL-Din 648.730.000
57 Execution The Fence For AL-Nasiriyah Gas Factory 2010 Dhi-Qar 251.140.000
58 Execution Of Boilers Foundations Of Salah AL-Din (2 th Stage) Refinery 2010 Salah AL-Din 439.050.000
59 Execution Of Works Under D. P. C. For The Building Of  The Internet Company 2010 Salah AL-Din 204.817.000
60 Execution First Floor In The Steel Shades In The Mechanical Workshop 2010 AL-Basra 450.000.000
61 Transport And Install Water Tank For Fire Equipments 2010 Baghdad 40.500.000
62 Treatment of the sixth chimney unit in  AL-Dora electric station 2011 Baghdad 1.000.000.000
63 Housing Units In Hai-Al Jhad 2011 Baghdad 19.248.000.117
64 Manufacturing And Erecting Steel Shodes Of AL-Kafa Cement Factory 2011 Holy Najaf 4.300.000.000
65 Execution Of Football Stadium For Housing Units Of AL-Dora Refinery 2011 Baghdad 394.270.000
66 Construction Of The Educational Oil Tower Base / AL-Burjisiya / 9 2011 AL-Basra 236.856.000
67 AL-Sheah-Wakf- Housing Complex 2011 Holy Najaf 3.858.772.000
68 Execution AL-Naisr Exchange For Communication 2011 Al-Diwaniyah 438.162.500 
69 Execution Of The Second Stage Of AL-Bergisiyah Water Storage And The Fence 2011 AL-Basra 1.100.167.000 
70 The Civil Works For (RO) Unit In Middle Refinery Company 2011 Baghdad 910.294.500 
71 Design And Execution Closed Store In Beiji  2011 Salah AL-Din 878.000.000 
72 Concrete Works For Salah Al-Din Refinery Steam Boilers / Baigy 1 2011 Salah AL-Din 747.660.000 
73 Renovation OF Inspection Sector Building In The Gas Filling Company 2011 Baghdad 105.531.000 
74 Execution Of The Security Fence For The Northern Refinery Company In Beiji  2011 Salah AL-Din 3.835.000.000
75 Housing  Complex In Al-Sayada 2011 Kirkuk 49.824.240.886
76 Sabeaa Temple 2011 Dhi-Qar 889.114.000
77 Construction Of The Man Entrance Road Of The Iraqi Drilling Company Building / AL-Burjisiya/ 8 2011 AL-Basra 360.450.000
78 Restudy, Design, Preparing Of Drawings And Bill Of Quantities For The Completion Works Of AL-Qadisiah Water Project 2011 Salah AL-Din 60.000.000
79 Construction Of Cooling Water Pipe For Fuel Improvement Unit And LPG Unit In AL-Dora Refinery 2011 Baghdad 162.395.000
80 Installation Of Pipes Net Work For Gas Generator In AL-Dora Refinery 2011 Baghdad 594.177.000
81 Execution The Building Of Police Station In AL-Dora 2011 Baghdad 3.111.852.100
82 Execution Of The Materials Management Building Of The Gas Filling Company 2011 Baghdad 291.703.000
83 Execution  Of  Pipes Network For The Gas Generator In Al-Dora Refinery 2011 Baghdad 636.871.800
84 Execution  Of  Reservoirs Paining Works For The Middle Refinery Company 2011 Baghdad 236.810.000
85 Execution  Of  Reservoirs Bases For The Northern Gas Company 2011 Kirkuk 103.960.000
86 Rehabilitation Of Iskan Sport Club 2011 Baghdad 283.248.500
87 Installation Of Quests Home In -AL-Bergisiyah (Stage One) 2011 AL-Basra 1.798.275.000
88 Water Injection – West Of Qurna (4 ، 5 ، 6) 2011 AL-Basra 1.200.267.919
89 Water Pump Installation At The Tigris Bank In  Al-Dora Refinery  2011 Baghdad 486.549.800
90 Implementation Of (BRC) Fence For Fuel Improvement Unit In  Al-Dora Refinery 2011 Baghdad 13.300.000
91 Spheris Storage In AL-Gas Company 2011 Baghdad ، Babil ، AL-Diwania ، AL-Basra ، Maysan ، Dhi-Qar ، Wasit ، Holy Najaf ، Nineveh 13.788.138.680
92 Treatment of the fifth chimney unit in  AL-Dora electric station 2011 Baghdad 1.000.000.000
93 Connecting ( Ø 8") Fire Fighting Water Pipe From Al-Dora Refinery To Gas Plant 2011 Baghdad 104.305.000
94 Reconstruction & Rehabilitation Of Wasitt Governorate Building 2011 Wasit 2.124.827.500
95 Execution Of AL-Bathaa Markets 2011 Dhi-Qar 1.269.688.000
96 Connecting Electricity From Zoss Station In Zubair To The New South Operation Division And The Housing Complex / AL-Burjisiya / 6 2011 AL-Basra 3.142.064.000
97 Execution  Of  The Sand Works For The Modern Complex Of Food Stuffs Supply 2011 Arbil 1.047.200.000
98 Execution  Of  Site Laboratory Building And The Central Meeting Room In  Al-Dora Refinery 2011 Baghdad 658.140.000
99 Execution Of Civil Works For The New Boiler In Oil Northern Refineries 2012 Baghdad 2.202.348.500
100 Execution  Of  Booster Pumps Foundations  For AL-Fao Oil Storing 2012 AL-Basra 1.109.460.000
101 Water Pipe Works For Sector (18) In  Al-Dora Refinery 2012 Baghdad 631.900.000
102 Execution Of The College Of Sciences / Diyala University 2012 Diyala 1.995.741.700
103 Construction Of Administration Building For AL-Furat Chemical Industries Company 2012 Sacred Karbala 471.780.000
104 Execution Building of Boarding Houses For Oil Training Institute 2012 AL-Basra 5.688.279.000
105 Construction Of Iraqi Drilling Company Building / AL-Burjisiya /7 2012 AL-Basra 7.568.502.250
106 Administration Building Works In AL-Moftyah Gas Plant 2012 AL-Basra 100.000.000
107 The Construction Of Visitors City In AL-Hindiya 2012 Sacred Karbala 754.841.181
108 Housing  Complex In Al-Salam 2012 Holy Najaf 49.357.456.200
109 Foundation Works For Internet Building  // SCIS 2012 Holy Najaf 315.769.500
110 Road Works In Ninevah Gaseous Power Station 2012 Nineveh 1.561.000.000
111 Control Rooms Maintenance In  Al-Dora Refinery 2012 Baghdad 450.738.000
112 Execution Of The Final Stages For The College Of Education / Sacred Karbalaa University 2012 Sacred Karbala 3.601.942.500
113 Cars Repairing Workshop / First Stage 2012 Baghdad 1.071.344.000
114 Industrial Sheds Works In Cylinders Repairing Factory At Hammam AL-Alyl 2012 Nineveh 1.948.504.000
115 Filter Pipe Works For Sector (7 / 4) In Al-Dora Refinery 2012 Baghdad 1.208.625.000
116 Earth Works In AL-Mansoryah Gas Power Station 2012 Diyala 9.238.138.500
117 Industrial Sheds Works In Cylinders Repairing Factory At Hammam AL-Alyl /  (4th  Stage) 2012 Nineveh 1.962.963.000
118 Continuation Works For The Steam Boiler And The Steel Structure For The Middle Refinery Company In Al-Dora Refinery 2012 Baghdad 467.841.250
119 Execution Of Administration Building For AL-Taji Electrical Gas Station No. (2) 2012 Baghdad 374.820.000
120 Road Works In AL-Mansoryah Gas Power Station 2012 Diyala 2.000.000.000
121 Rehabitation Of Stores And Service Rooms In  AL-Kout Machinery Workshop 2012 Wasit 253.925.000
122 Foundation Works For Internet Building  // SCIS 2012 Babil 328.570.500
123 Water Intake Works In AL-Diwaniyah Gaseous Power Station 2012 Al-Diwaniyah 2.827.475.000
124 Fixing The Coating Of The Fifth Chimney For Electrical Heating Station In Al-Dora 2012 Baghdad 950.000.000
125 Soda Tanks Works Of (4)  In Chemical Industries Company 2012 Sacred Karbala 441.863.500
126 Execution Of Building At The State Company For Internet Services // SCIS  2012 Dhi-Qar 608.168.500
127 Civil Works For Cylinders Repairing Works shop In AL-Nasiryah / 4 2012 Dhi-Qar 1.986.983.000
128 Civil Works Of Concrete Sleeves And Steel Structure For The Feeding Pipes Of Azmara Unit 2012 Baghdad 1.993.008.000
129 Supplying , installing And Operating Of Water Treatment Unit In AL-Gayarah Refinery 2012 Nineveh 830.000.000
130 Sanitary Works Network In Al-Dora Refinery 2012 Baghdad 2.267.825.000
131 Road Works In AKAZ Gaseous Power Station 2012 AL-Anbar 5.260.387.800
132 Civil Works For Cylinders Repairing Works shop In AL-Nasiryah / 2 2012 Dhi-Qar 1.988.707.000
133 Execution Of Fence Surrounding Globular Tank In AL-Ramady Gas Foundry \ Gas Filling Company 2013 AL-Anbar 702.270.000
134 Rehabilitation Of Sayedet AL-Najat Church With An Extension Of The Contract No. (1) 2013 Baghdad 2.860.194.500
135 (OSEL) Pipes Works For Azmara Unite 2013 Baghdad 1.565.017.500
136 Execution And Renew Of Fire Fighting Pipes Network In Al-Dora Refinery / 2nd Stage 2013 Baghdad 3.125.796.500
137 Construction Of Mechanicals Building At Production Department In Gas Filling Company 2013 Baghdad 160.371.000
138 Water Intake For AL-Kairat Gaseous Power Station 2013 Sacred Karbala 1.770.000.000
139 Water Intake For AL-Haidaryh Gaseous Power Station 2013 Sacred Karbala 4.712.000.000
140 Earth Filling Of Floor In Middle Euphrates Gas Store 2013 Babil 453.700.000
141 Ministry Of Construction & Housing \ Head Office Building 2013 AL-Muthanna 3.525.545.120
142 Supply Pipes Network For The New Dura Workhouse In Al-Dora Refinery 2013 Baghdad 832.766.175
143 Execution Of Second Floor Laboratory Building Of  The Middle Refinery Company 2013 Baghdad 244.495.000
144 Foundation Works For (8)  H2SO4 Tanks 2013 Sacred Karbala 427.000.000
145 Repairing Cavitations Of AL-Dura Power Station 2013 Baghdad 950.000.000
146 Sand Works And Execution Of Fence For AL-Latifiya Gas Factory 2013 Babil 1.980.924.000
147 Fire Extinguishing Building In AL-Diwaniyah Gas Plant 2013 Al-Diwaniyah 233.213.500
148 Services Building Works For AL-Latifiya Site 2013 Babil 1.248.816.500
149 Execution Of Civil & Mechanical Works For AL-Qa'me Gas Factory In Gas Filling Company 2013 AL-Anbar 746.483.000
150 Pipes Network For The Residential District In Al-Dora Refinery 2013 Baghdad 1.680.600.000
151 Maintenance Of AL-Sarafiya Bridge 2013 Baghdad 420.000.000
152 Execution  Of  The Complete Project For The Infrastructures / University Of Tikrit 2013 Salah AL-Din 6.698.775.000
153 Al- Amiriyah Bridge 2013 AL-Anbar 13.842.645.188
154 Civil And Electromechanical Works In Al Emarah Gas Plant 2013 Maysan 4.573.372.750
155 Execution Of Services Buildings Works In Al-Najaf  Gas Plant 2013 Holy Najaf 1.126.970.200
156 Earth Works And Fence Execution In Al-Najaf  Gas Plant 2013 Holy Najaf 921.915.000
157 Constricting Interchange Bridge And Around For Soda Project  2013 Sacred Karbala 134.000.000
158 Rehabilitation Of The Area Between The Two Holy Shrines In Sacred Karbalaa 2013 Sacred Karbala 4.134.798.000
159 Installation Of Electrical Power Line (2nd Stage) For ZOSS Power Station In AL-Zubair 2013 AL-Basra 1.103.100.000
160 Execution Of A Human Rights National Net Bureau 2014 AL-Anbar 2.064.209.000
161 Execution Of AL-Hila Electrical Gas Station (2) In Abi Garaq 2014 Babil 1.952.159.000
162 Rehabilitation Of Sayedet AL-Najat Church With An Extension Of The Contract No. (2) 2014 Baghdad 602.354.000
163 Execution Of Filling Station In AL-Wasiti District 2014 Kirkuk 1.545.987.000
164 Misan Housing Complex 2014 Maysan 30.976.858.715
165 Execution  Of  Faculty Of Arts / University Of Sacred Karbalaa 2014 Sacred Karbala 6.207.862.500
166 Implementation Of Sewerage And Rain Water Network And Lifting Stations / University Of Sacred Karbalaa 2014 Sacred Karbala 4.475.394.500
167 Execution Of Statistics Sections Training Center In AL-Kufa District 2014 Holy Najaf 2.138.519.000
168 Filling And Secretion The Land Of Political Prisoners Foundation 2014 AL-Basra 2.019.800.000
169 Civil And Electromechanical Works In Aby Ghraib Gas Plant 2014 Baghdad 2.849.953.500
170 Rehabilitation Of Beije Gas Plant Shed 2014 Salah AL-Din 357.525.000
171 Civil , Mechanical And Electrical  Works For Al-Samawa Gas Filling Line 2014 AL-Muthanna 1.369.267.200
172 Execution Of Protection Towers No. (10) For Gas Plants 2014 Baghdad ، Babil ، AL-Diwania ، AL-Muthanna ، Maysan 611.362.000
173 Planning Section  Building 2014 Babil 1.724.405.460
174 Execution Of Project And Engineering Test Section Building In Alforat Alawsat Branch 2014 Babil 440.525.000
175 Boarding Houses / Bab AL- Muadam (1th stage) 2014 Baghdad 9.150.858.600
176 Execution Of National Net For Human Rights Bureau 2014 Maysan 1.887.848.820
177 Construction Of Fence And Scrap Area For Southern Branch 2014 AL-Basra 199.700.000
178 Rehabilitation And Maintenance Of (3) Cooling Towers In AL-Dora Refinery 2014 Baghdad 3.210.000.000
179 Install And Erect AL-Dora Silo 2014 Baghdad 11.738.350.000
180 National Net For Human Rights   Bureau 2014 Holy Najaf 2.166.685.620
181 Construction The Road Of Misan Gas Plant 2014 Maysan 175.000.000
182 Construction Of Six School Class Wings (AL-Furat, AL-Hindiya, AL-Nawadim And The Nawaris Kindergarten) 2014 Sacred Karbala 1.125.493.000
183 Construction Of Specialized Building For Iraqi Researches And Arabic Codes Project 2014 Baghdad 3.388.786.500
184 Design And Implementation Of Printing Machine Building For AL-Sabah Newspaper 2014 Baghdad 4.661.410.156
185 Execution And Renew Of Fire Fighting Pipes Network In Al-Dora Refinery / 3nd Stage 2014 Baghdad 6.850.271.000
186 Earth Works And Fence Execution For Karbala Gas Plant 2014 Sacred Karbala 2.893.460.000
187 National Net For Human Rights   Bureau 2014 Al-Diwaniyah 2.119.560.600
188 Execution Of Rest House Building For Ministry Of Construction And Housing Staff 2015 Holy Najaf 2.594.878.550
189 Construction The Building Of Al-Samawa Police Oil 2015 AL-Muthanna 323.885.000
190 Execution Of institution building of oil production distribution in Middle Euphrates. 2015 Babil 5.073.435.300
191 Ministry Of Construction & Housing \ Head Office Building 2015 Kirkuk 8.885.207.810
192 Establishing Gaseous Generator Piping Plant In AL-Dora Refinery  / Third  Stage 2015 Baghdad 587.969.000
193 Rest House Execution For The Middle Refinery Company / AL-Thaalba 2015 Baghdad 3.041.971.000
194 Civil Works For Oil Mixing And Hydrogen Filtration Unit 2015 Baghdad 1.109.555.000
195 Execution Of Karbala Civil Laboratory Building 2015 Sacred Karbala 3.796.762.009
196 Civil Works For Western Baghdad Power Station Extension 2015 Baghdad 573.525.000
197 Execution Of The Boarding House For Oil Training Institute / 2nd Stage 2015 AL-Basra 6.588.954.000
198 Earth And Civil Works For The Outer Fence And Guards Building For Transforming Stations In Different Sites 2015 Several Governorates 10.099.602.500
199 Construction Of Pumps Foundations In AL-Fao Oil Storage 2015 AL-Basra 2.450.000.000
200 Construction A Fence Surrounding The Housing Complex In Gas Filling Company 2015 Baghdad 796.075.000
201 Rest House Building 2015 Dhi-Qar 2.722.759.293
202 OSBL Pipe Lines For Hydrogen Production Unit 2016 Baghdad 2.062.885.000
203 Misan Maternity Hospital 2016 Maysan 39.783.991.427
204 Construction Of Two Floors Storage Area In AL-Dora Refinery 2016 Baghdad 2.486.175.000
205 Rehabiltation Of Midoil Company Entrance 2016 Baghdad 342.670.000
206 Execution Of A Three Stores Building With Extensions For Midland Oil Company Building 2016 Baghdad 3.815.717.650
207 Excution Of Steam Pipes Net For Oils Unit No.2 2016 Baghdad 426.044.000
208 Civil And Electromechanical Works For Misan Gas Plant 2016 Maysan 2.826.994.000
209 Construction Of Fence And Sub Road For Dyala Gas Warehouse 2016 Diyala 1.074.565.000
210 Earth Works And Construction Of Outer Road  For Dyala Gas Warehouse 2016 Diyala 1.680.534.000
211 Service And Administration Buildings For Circular Storage Tank 2016 Sacred Karbala 1.594.652.000
212 Civil, Electrical And Mechanical Works For Gas Filling Pipe Line In Najaf Gas Factory 2016 Holy Najaf 1.089.355.000
213 Construction Of Archives Building For The Gas Filling Company In Taji 2017 Baghdad 359.747.000
214 Field Works Of Installation And Construction In Samawa 2017 AL-Muthanna 3.866.552.000
215 Reconstruction Of Imam Ways Bridges No.(4) And No.(7) 2017 Diyala 2.322.968.000
216 Construction Of Concrete Storage Tank In Al-Nasiriya Store 2017 Dhi-Qar 416.980.000
217 Execution Of Welding Works For Steam Pipes, Water Pipes And Air Pipes For Polluted Water Unit Within (3000) inch diagonal welded 2017 Baghdad 60.000.000
218 Reconstruction Of Al-Dhuluiya Big And Small Bridges And Approaches 2017 Salah AL-Din 5.633.169.200
219 Execution Of Welding Works (4000) Inch Diagonal Welded 2017 Baghdad 90.000.000
220 Construction Of Research Department Laboratory In Oil Pipelines Company In AL-Doora Refinery 2017 Baghdad 289.194.000
221 Carbon Steel Pipe (24) inch From River Intake To Cooling Towers 2017 Baghdad 164.830.000
222 Construction Of Financial Department Annix In Gas Filling Company 2017 Baghdad 739.885.000
223 Construction Of Cooling Water Pipe For Light Oil Units (54) 2017 Baghdad 2.738.981.800
224 Construction Of Cooling Water Pipe For Light Oil Units (36) 2017 Baghdad 2.464.820.240
225 Rehabilitation Of Mosul Forth Bridge 2018 Nineveh 1.044.012.000
226 Supplying And Installation Of Pontoon At Euphrates River In Heet Region 2018 AL-Anbar 194.400.000
227 Development Of AL-Kifil Petrol Public Station 2018 Babil 2.241.308.500
228 Paving The Road Of Eight Houses And The Road Parallel To New Buildings In Oil Pipelines Company Headquarters 2018 Baghdad 414.800.000
229 Rehabilitation Of Ground floor In Government Counsil Building 2018 Baghdad 99.980.000
230 Rehabilitation Of Cylinders Preparing Workshop In AL-Kut Factory 2018 Wasit 165.000.000
231 Construction Of Gas Bureau Building In Karbala 2018 Sacred Karbala 1.305.023.950
232 Demolition And Rebuilding Of Al-Shora Secondary School 2018 Nineveh 750.236.000
233 Supply And Operate Two Elevators For AL-Basra Trade Room 2018 AL-Basra 121.200.000
234 Construction Of Brass Store In Gas Filling Company 2018 Baghdad 122.108.000
235 Pouring Reinforced Concrete For A Garage Of Cars And Heavy Machines In Gas Filling Company 2018 Baghdad 167.700.000
236 Rehabilitation Of Al-Alikhani mosque In Daquk 2018 Kirkuk 225.000.000
237 Construction Of Laboratory Building In Holy Najaf Storeroom 2018 Holy Najaf 116.164.000
238 Demolition And Rebuilding Of Al-Ashauis School In Samarra 2018 Salah AL-Din 469.258.000
239 Construction Of Laboratory Building In AL- Nasiriyah Storeroom 2018 Dhi-Qar 117.530.000
240 Rehabilitation Of External Pathways In Council Of State Building 2018 Baghdad 77.257.500
241 Extending Cables For Al-Sumood Refinery In Beji 2018 Salah AL-Din 907.000.000
242 Demolition And Rebuilding Of Al-Saqlawia Industry Preparatory 2018 AL-Anbar 1.311.529.150
243 Construction Of Dhi-Qar Governmental Gas Factory 2018 Dhi-Qar 880.000.000
244 Civil Works Of Tikrit University Boarding Houses 2018 Salah AL-Din 730.462.000
245 Civil Works For Cooling Towers Of AL-Dora Refinery 2018 Baghdad 10.382.616.500
246 Digging a Trench Around The Secure Fence At North Refinery Company Headquarter 2019 Salah AL-Din 644.000.000
247 Supply And Connection Of Plastic Pipes With Fittings For Sanitary Pipeline 2019 Baghdad 244.260.000
248 Execution Of Digging Fluid Channels In Eastern Baghada Oil Field 2019 Baghdad 236.346.000
249 Rehabilitation And Maintainance Of Damaged Buildings Roofs For AL-Sumood Refinery In Beji 2019 Salah AL-Din 537.550.000
250 Supply And Extending Cables For Petrol Improvement Unit And Liquid Unit 2019 Salah AL-Din 1.640.250.000
251 Building Of Seven Stone Border Stations 2019 AL-Anbar 887.390.000
252 Execution Of Boring Piles Works For Three Tanks In Al-Basra Refinery 2019 AL-Basra 6.113.700.000
253 Implementation Of Outer Fence , Earth Filling Works And Guards Room For Power Station 2019 Several Governorates 3.490.077.380
254 Rehabilitation Of  Holy Shrines 2019 Babil 339.619.500
255 Building Of Purchase And Contracts Department At Al Sumood Refinery In Beji 2019 Salah AL-Din 700.655.000
256 Rehabilitation Of Sheds At AL-Samood Refinery 2019 Salah AL-Din 1.482.000.000
257 Construction Of Two-Story's Building For Messan Inspection Branch 2019 Maysan 245.785.000
258 Rehabilitation Of (TBI) Bbilding In Al-Sinak 2019 Baghdad 1.674.420.000
259 Maintainance Of Clay Crusher LO2 2019 Holy Najaf 42.000.000
260 Demolition And Reconstruction Of AL-Iskandarona School 2019 Kirkuk 557.435.000
261 Rehabilitation Of Boarding Houses At AL-Qadisiya Complex In Mosul University 2019 Nineveh 555.369.000
262 Demolition And Reconstruction Of Jamal Abdulnaser Secondary School 2019 Salah AL-Din 528.360.000
263 Demolition And Reconstruction Of Beji Secondary School 2019 Salah AL-Din 980.658.750
264 Construction Of Bank Building In Al Nasiryah 2019 Dhi-Qar 744.155.000
265 Construction Of Residential Complex In Al-Shatra 2019 Dhi-Qar 29.545.874.027
266 Supply And Extending Electrical Cables For Petrol Improvement And Liquid Gas Units 2019 Salah AL-Din 513.000.000
267 National Net For Human Rights Bureau 2019 Sacred Karbala 2.239.839.750
268 Curing Under Foundations Of Eductional Open College Building 2020 AL-Basra 100.000.000
269 Cleansing Of Paths And Areas From Polluted Soil In Midland Refineries Company 2020 Baghdad 194.392.475
270 Paving Service Road Leading To Fuel Loading Site In Al-Shieba With Road And Yard Of Fuel Loding Site In Khor Al-Zubair 2020 AL-Basra 5.442.195.000
271 Construction Of Al Darrji Bridge 2020 AL-Muthanna 5.019.135.000
272 Kirkuk Water Supply / Second Stage 2020 Kirkuk 93.897.440.000
273 Roads And Bridges Building (Baghdad -Yosifya) 2020 Baghdad 7.385.455.172
274 Construction Of Concrete Tank In Al-Rasafa Storage 2020 Baghdad 161.320.000
275 Supply , Excution And Errection Of Concrete Units (T-Wall) 2020 Baghdad 372.093.000
276 Implementation Of Three Shelters In Al Emarah Storage 2020 Maysan 1.178.100.000
277 Paving Yard And External Roods At AL-Karkh Store 2020 Baghdad 3.240.860.000
278 Demolition And Reconstruction Of Three Police Stations 2021 Kirkuk 508.113.500
279 Plumbing And Carpentry Workshop In Salah AL-Din Refinery 2021 Salah AL-Din 391.115.000
280 Supply And Excution Of Precast Concrete Piles With Two Test Piles In AL-Dorah Refinery 2021 Baghdad 1.562.911.200
281 Design And Execution Of Steel Bridge For Pipes Cross Over In Al-Fatha Zone Between Kirkuk And Salah Al-Din Governorates 2021 Salah AL-Din 2.375.000.000
282 Supply , Extension And Filling Of Electirical Cables For (RO) Unit 2021 Salah AL-Din 324.750.000
283 Rehabilitation Of Work And Social Affairs Ministry Site 2021 Baghdad 1.251.968.500
284 Maintenance And Rehabilitation Of Al-Touz Concrete Bridge 2021 Kirkuk 2.052.790.000
285 Construction Of Three Protection Buildings For AKAZ Oil Field 2021 AL-Anbar 524.850.000
286 Surfacing Of The Road Leading Towards Pumping Unit In Kirkuk Refinery 2021 Kirkuk 448.000.250
287 Dynamic Balance Workshop In Salah AL-Din Refinery 2021 Salah AL-Din 263.692.000
288 Rehabilitation Of Tikrit - Alalam Bridge With Its Approaches 2021 Salah AL-Din 11.519.699.356
289 Demolition And Reconstruction Of Al-Mutasim district And Rehabilition And Maintaince Of Balad Youth Center 2021 Salah AL-Din 782.609.500
290 Construction Of (12) Class School In Al-Nasir Quarter 2021 Kirkuk 589.644.500
291 Civil Works For Two Spherical Tanks In Altaji 2021 Baghdad 1.031.990000
292 Financial Department Building In Salah AL-Din Refinery 2021 Salah AL-Din 2.260.249.640
293 Remaining Works For Al-Hafiz Bridge 2021 Dhi-Qar 1.008.310.000
294 Construction Of Archive Building For Contracts Department In Northern Refineries 2022 Salah AL-Din 424.900.000
295 Demolition And Reconstruction Of Zummar Secondary School And Rehabilitation Of Abu-Khshab School In Rabiaa 2022 Nineveh 739.203.600
296 Building Of Electrial Transformers Reparing Workshop 2022 Nineveh 904.697.550
297 Execution Of Workshop For Cars Gas System Addtion In Al-Taji Gas Factory 2022 Baghdad 869.271.000
298 Construction Of Youth Center In Tallafar (Contract Extension) 2022 Nineveh 1.293.785.000
299 Demoltion And Reconstruction Of Al-Haidarya Fuel Station 2022 Holy Najaf 5.580.985.000
300 Construction Of Study Halls In Al-Hawija Technical Institute 2022 Kirkuk 1.400.697.250
301 Construction Of The Temporary Iron Bridge As An Alternative To The Al-Khidr Bridge 2022 AL-Muthanna 1.521.380.000
302 Maintenance And Rehabilitation Of Cooling Towers In AL-Dorah Refinery 2023 Baghdad 1.783.360.000
303 Construction Of General Materials Sheds In Baiji Refinery Stores 2023 Salah AL-Din 199.950.000
304 Supplying, Extending And Burying Electrical Cables For The Al-Azmarah Unit In Salah Al-Din Refinery (2) 2023 Salah AL-Din 1.230.985.000
305 Construction Of Boarding Houses Builiding In Technical Institute / AL-Hawija 2023 Kirkuk 1.621.773.250
306 Iraqi Housing Fund Building 2023 Sacred Karbala 943.713.000
307 Construction Of A Fixed Iron Bridge Instead Of The Collapsed Sand Bridge 2023 Maysan 1.426.700.000
308 Information Building Of The Ministry Of Construction, Housing, Municipalities And Public Works 2023 Baghdad 391.955.000
309 Execution Of Workshop For Cars Gas System Addtion In Al-Sumood Gas Factory With Supplement 2023 Baghdad 1.499.476.497
310 Restoration Of (7) Schools In Sabaa El-Bour 2023 Baghdad 907.074.000
311 Cathodic Protection System For (LPG) Tanks At The Royal Tulip Al-Rasheed Hotel 2024 Baghdad 88.000.000
312 Supplying, Constructing And Installing A ( BRC) Fence With Bellows Wire On The Iraqi-Iranian Border 2024 Wasit 7.999.992.000

 

Hot Posts

FIELD VISITS

Recommended Posts