| 1 | Al- Roumaitha Bridge | 2004 | Muthanna | 252.174.000 | 
| 2 | Reconstruction Of The Company Head Office | 2004 | Baghdad | 788.414.157 | 
| 3 | Rehabilitation Of  The Ministry Stores In Alamiryah | 2005 | Baghdad | 174.468.042 | 
| 4 | Talafar Water Station – Unified Zummar (1st Stage) | 2005 | Nineveh | 6.066.351.000 | 
| 5 | Water Injection – West Of  Qurna (4th Stage) | 2005 | Basra | 827.751.240 | 
| 6 | Rehabilitation Of  Baghdad Touristic Island | 2005 | Baghdad | 767.375.000 | 
| 7 | The Building Of  The Administration Of Babil Sewerage Network | 2006 | Babil | 461.841.620 | 
| 8 | The Second Passage Bridges To AL-Khalis-AL-Adhaim Highway | 2006 | Diyala | 1.479.823.668 | 
| 9 | Petroleum Products Building | 2007 | Maysan | 805.500.000 | 
| 10 | Design Drawings For Ibn-Albaladi Hospital | 2007 | Baghdad | 102.900.000 | 
| 11 | Consultations To Al-Najaf  Hospital | 2007 | Holy Najaf | 200.000.000 | 
| 12 | Water Pipe Line Of Ain - AL-Tamer Province | 2007 | Sacred Karbala | 1.351.600.000 | 
| 13 | Manufacturing Of Caravans | 2007 | Baghdad | 61.600.000 | 
| 14 | Schools Building | 2008 | All Governorates | 47.428.945.070 | 
| 15 | Head Office Building For The General Commission For Taxes | 2008 | Diwaniyah | 722.154.332 | 
| 16 | Traffic Control Buildings | 2008 | Babil | 1.611.925.746 | 
| 17 | AL Sarrafya Truss Bridge Reconstruction | 2008 | Baghdad | 13.000.000.000 | 
| 18 | Rehabilitation Of  Measurement And Quality Control Laboratories | 2008 | Baghdad | 145.889.000 | 
| 19 | Rehabilitation Of  Measurement And Quality Control Service Building | 2008 | Baghdad | 115.443.315 | 
| 20 | The Installation Of  First Floor In The Training Building | 2008 | Baghdad | 453.550.000 | 
| 21 | Rehabilitation Of  Arar Buildings Complex Border Outlet | 2008 | Anbar + Sacred Karbala | 4.110.394.661 | 
| 22 | Hilla Gas Turbine Power Station Building | 2008 | Babil | 4.364.150.500 | 
| 23 | Ministry Of Construction & Housing \ Head Office Building | 2008 | Holy Najaf | 2.954.111.503 | 
| 24 | Grains Silo Expansion | 2008 | Anbar | 4.416.154.293 | 
| 25 | Electric Power Transmission Administration Building | 2008 | Baghdad | 2.313.838.000 | 
| 26 | Improvement Of Crude Oil Discharging site | 2008 | Baghdad | 831.762.500 | 
| 27 | Improvement Of  The Main Road In Hindiya | 2009 | Babil | 1.408.866.400 | 
| 28 | The Maintenance Of  Chalt , AL-Teeb , Border Line | 2009 | Maysan | 1.872.025.000 | 
| 29 | Execution Of  Exterior Pipe Line With Capacity (70.000) Burrels In AL-Doora Refinery | 2009 | Baghdad | 4.674.855.000 | 
| 30 | Treatment Of  The Third Chimney In AL-Doora Electrical Power Station | 2009 | Baghdad | 350.000.000 | 
| 31 | Treatment Of  The Fourth Chimney In AL-Doora Electrical Power Station | 2009 | Baghdad | 300.000.000 | 
| 32 | The Work Includes Installing Electrical Elevator And The Treatment Of  The Third Chimney From Level (20m Up To 100m) In  AL-Doora Electrical Power Station | 2009 | Baghdad | 375.000.000 | 
| 33 | The Execution Of Weight Bridge With (75) Ton Capacity In Beejy | 2009 | Salah AL-Din | 98.963.600 | 
| 34 | The Laying Of Cooling Tube (16) Inch In AL-Doora Refinery | 2009 | Baghdad | 117.698.000 | 
| 35 | Execution The Residual Work In Scholastic Buildings | 2009 | Anbar + Diwania | 3.438.075.072 | 
| 36 | Replacing The Re-Heat Coils For The Fourth Chimney In AL-Doora Electrical Power Station | 2009 | Baghdad | 850.000.000 | 
| 37 | Executing A Third Floor For The Civilian Defense General Head Quarters | 2009 | Baghdad | 1.385.979.000 | 
| 38 | Talafar Water Station – Unified Zummar (2st Stage) | 2009 | Nineveh | 45.203.116.555 | 
| 39 | Supplying The Imported Equipments For The Project Of  Tellafor - Zummar Unified - Second Stage | 2009 | Nineveh | 22.634.195.136 | 
| 40 | Digging And Reclamation Company - AL-Burjisiya | 2009 | Basra | 1.885.779.000 | 
| 41 | Improvement Of  Al_Hindiya City Nearby Babylon Governorate | 2009 | Babil | 3.972.232.000 | 
| 42 | Installation Of The South Head Quarter Building - AL-Burjisiya | 2009 | Basra | 2.648.690.000 | 
| 43 | Installation Of  AL-Fao Oil Storage  Building | 2009 | Basra | 1.657.610.600 | 
| 44 | Beji Refineries Company Gates | 2009 | Salah AL-Din | 937.605.000 | 
| 45 | Execution The Capacity Of Storage In AL-Risafa Gas Factory | 2010 | Baghdad | 658.710.762 | 
| 46 | Execution Of Concrete Baes For AL-Kufa Cement Factory | 2010 | Holy Najaf | 3.211.628.056 | 
| 47 | The Execution Of Infrastructure For Thee-Qar University (2 th Stage) | 2010 | Dhi-Qar | 3.212.591.000 | 
| 48 | The Civil And Mechanical Works For The Pipes Of Second Refinery Unit In AL-Dora | 2010 | Baghdad | 3.023.763.500 | 
| 49 | The Civil And Mechanical Works For The Cooling  Pipes Of Second Refinery Unit In AL-Dora | 2010 | Baghdad | 1.630.067.000 | 
| 50 | Measurement And Quality Control | 2010 | Baghdad | 3.336.217.500 | 
| 51 | Execution The Residual Work In Scholastic Buildings | 2010 | Maysan | 5.330.499.330 | 
| 52 | The Treatment Of  The Settlement Of  AL-Clinker Conveyor For The First Line Of  Kerbalaa Cement Factory | 2010 | Sacred Karbala | 96.912.000 | 
| 53 | Execution of closed sport hall (500) audiences [Al- gadwal al-gharbi , al-hussainiya , al-mahaweel , al-hendiya] | 2010 | Sacred Karbala + Babil | 6.241.187.500 | 
| 54 | Execution Of The Third Stage Of AL-Bergisiyah Head Quarters | 2010 | Basra | 2.377.910.000 | 
| 55 | Install The Steam Boiler In Kirkuk Refinery | 2010 | Kirkuk | 597.550.000 | 
| 56 | Execution Of Sewage Network In AL-Naft-District / Beiji | 2010 | Salah AL-Din | 648.730.000 | 
| 57 | Execution The Fence For AL-Nasiriyah Gas Factory | 2010 | Dhi-Qar | 251.140.000 | 
| 58 | Execution Of Boilers Foundations Of Salah AL-Din (2 th Stage) Refinery | 2010 | Salah AL-Din | 439.050.000 | 
| 59 | Execution Of Works Under D. P. C. For The Building Of  The Internet Company | 2010 | Salah AL-Din | 204.817.000 | 
| 60 | Execution First Floor In The Steel Shades In The Mechanical Workshop | 2010 | Basra | 450.000.000 | 
| 61 | Transport And Install Water Tank For Fire Equipments | 2010 | Baghdad | 40.500.000 | 
| 62 | Treatment of the sixth chimney unit in  AL-Dora electric station | 2011 | Baghdad | 1.000.000.000 | 
| 63 | Housing Units In Hai-Al Jhad | 2011 | Baghdad | 19.248.000.117 | 
| 64 | Manufacturing And Erecting Steel Shodes Of AL-Kafa Cement Factory | 2011 | Holy Najaf | 4.300.000.000 | 
| 65 | Execution Of Football Stadium For Housing Units Of AL-Dora Refinery | 2011 | Baghdad | 394.270.000 | 
| 66 | Construction Of The Educational Oil Tower Base / AL-Burjisiya / 9 | 2011 | Basra | 236.856.000 | 
| 67 | AL-Sheah-Wakf- Housing Complex | 2011 | Holy Najaf | 3.858.772.000 | 
| 68 | Execution AL-Naisr Exchange For Communication | 2011 | Diwaniyah | 438.162.500 | 
| 69 | Execution Of The Second Stage Of AL-Bergisiyah Water Storage And The Fence | 2011 | Basra | 1.100.167.000 | 
| 70 | The Civil Works For (RO) Unit In Middle Refinery Company | 2011 | Baghdad | 910.294.500 | 
| 71 | Design And Execution Closed Store In Beiji | 2011 | Salah AL-Din | 878.000.000 | 
| 72 | Concrete Works For Salah Al-Din Refinery Steam Boilers / Baigy 1 | 2011 | Salah AL-Din | 747.660.000 | 
| 73 | Renovation OF Inspection Sector Building In The Gas Filling Company | 2011 | Baghdad | 105.531.000 | 
| 74 | Execution Of The Security Fence For The Northern Refinery Company In Beiji | 2011 | Salah AL-Din | 3.835.000.000 | 
| 75 | Housing  Complex In Al-Sayada | 2011 | Kirkuk | 49.824.240.886 | 
| 76 | Sabeaa Temple | 2011 | Dhi-Qar | 889.114.000 | 
| 77 | Construction Of The Man Entrance Road Of The Iraqi Drilling Company Building / AL-Burjisiya/ 8 | 2011 | Basra | 360.450.000 | 
| 78 | Restudy, Design, Preparing Of Drawings And Bill Of Quantities For The Completion Works Of AL-Qadisiah Water Project | 2011 | Salah AL-Din | 60.000.000 | 
| 79 | Construction Of Cooling Water Pipe For Fuel Improvement Unit And LPG Unit In AL-Dora Refinery | 2011 | Baghdad | 162.395.000 | 
| 80 | Installation Of Pipes Net Work For Gas Generator In AL-Dora Refinery | 2011 | Baghdad | 594.177.000 | 
| 81 | Execution The Building Of Police Station In AL-Dora | 2011 | Baghdad | 3.111.852.100 | 
| 82 | Execution Of The Materials Management Building Of The Gas Filling Company | 2011 | Baghdad | 291.703.000 | 
| 83 | Execution  Of  Pipes Network For The Gas Generator In Al-Dora Refinery | 2011 | Baghdad | 636.871.800 | 
| 84 | Execution  Of  Reservoirs Paining Works For The Middle Refinery Company | 2011 | Baghdad | 236.810.000 | 
| 85 | Execution  Of  Reservoirs Bases For The Northern Gas Company | 2011 | Kirkuk | 103.960.000 | 
| 86 | Rehabilitation Of Iskan Sport Club | 2011 | Baghdad | 283.248.500 | 
| 87 | Installation Of Quests Home In -AL-Bergisiyah (Stage One) | 2011 | Basra | 1.798.275.000 | 
| 88 | Water Injection – West Of Qurna (4 ، 5 ، 6) | 2011 | Basra | 1.200.267.919 | 
| 89 | Water Pump Installation At The Tigris Bank In  Al-Dora Refinery | 2011 | Baghdad | 486.549.800 | 
| 90 | Implementation Of (BRC) Fence For Fuel Improvement Unit In  Al-Dora Refinery | 2011 | Baghdad | 13.300.000 | 
| 91 | Spheris Storage In AL-Gas Company | 2011 | Baghdad ، Babil ، Diwania ، Basra ، Maysan ، Dhi-Qar ، Wasit ، Holy Najaf ، Nineveh | 13.788.138.680 | 
| 92 | Treatment of the fifth chimney unit in  AL-Dora electric station | 2011 | Baghdad | 1.000.000.000 | 
| 93 | Connecting ( Ø 8") Fire Fighting Water Pipe From Al-Dora Refinery To Gas Plant | 2011 | Baghdad | 104.305.000 | 
| 94 | Reconstruction & Rehabilitation Of Wasitt Governorate Building | 2011 | Wasit | 2.124.827.500 | 
| 95 | Execution Of AL-Bathaa Markets | 2011 | Dhi-Qar | 1.269.688.000 | 
| 96 | Connecting Electricity From Zoss Station In Zubair To The New South Operation Division And The Housing Complex / AL-Burjisiya / 6 | 2011 | Basra | 3.142.064.000 | 
| 97 | Execution  Of  The Sand Works For The Modern Complex Of Food Stuffs Supply | 2011 | Arbil | 1.047.200.000 | 
| 98 | Execution  Of  Site Laboratory Building And The Central Meeting Room In  Al-Dora Refinery | 2011 | Baghdad | 658.140.000 | 
| 99 | Execution Of Civil Works For The New Boiler In Oil Northern Refineries | 2012 | Baghdad | 2.202.348.500 | 
| 100 | Execution  Of  Booster Pumps Foundations  For AL-Fao Oil Storing | 2012 | Basra | 1.109.460.000 | 
| 101 | Water Pipe Works For Sector (18) In  Al-Dora Refinery | 2012 | Baghdad | 631.900.000 | 
| 102 | Execution Of The College Of Sciences / Diyala University | 2012 | Diyala | 1.995.741.700 | 
| 103 | Construction Of Administration Building For AL-Furat Chemical Industries Company | 2012 | Sacred Karbala | 471.780.000 | 
| 104 | Execution Building of Boarding Houses For Oil Training Institute | 2012 | Basra | 5.688.279.000 | 
| 105 | Construction Of Iraqi Drilling Company Building / AL-Burjisiya /7 | 2012 | Basra | 7.568.502.250 | 
| 106 | Administration Building Works In AL-Moftyah Gas Plant | 2012 | Basra | 100.000.000 | 
| 107 | The Construction Of Visitors City In AL-Hindiya | 2012 | Sacred Karbala | 754.841.181 | 
| 108 | Housing  Complex In Al-Salam | 2012 | Holy Najaf | 49.357.456.200 | 
| 109 | Foundation Works For Internet Building  // SCIS | 2012 | Holy Najaf | 315.769.500 | 
| 110 | Road Works In Ninevah Gaseous Power Station | 2012 | Nineveh | 1.561.000.000 | 
| 111 | Control Rooms Maintenance In  Al-Dora Refinery | 2012 | Baghdad | 450.738.000 | 
| 112 | Execution Of The Final Stages For The College Of Education / Sacred Karbalaa University | 2012 | Sacred Karbala | 3.601.942.500 | 
| 113 | Cars Repairing Workshop / First Stage | 2012 | Baghdad | 1.071.344.000 | 
| 114 | Industrial Sheds Works In Cylinders Repairing Factory At Hammam AL-Alyl | 2012 | Nineveh | 1.948.504.000 | 
| 115 | Filter Pipe Works For Sector (7 / 4) In Al-Dora Refinery | 2012 | Baghdad | 1.208.625.000 | 
| 116 | Earth Works In AL-Mansoryah Gas Power Station | 2012 | Diyala | 9.238.138.500 | 
| 117 | Industrial Sheds Works In Cylinders Repairing Factory At Hammam AL-Alyl /  (4th  Stage) | 2012 | Nineveh | 1.962.963.000 | 
| 118 | Continuation Works For The Steam Boiler And The Steel Structure For The Middle Refinery Company In Al-Dora Refinery | 2012 | Baghdad | 467.841.250 | 
| 119 | Execution Of Administration Building For AL-Taji Electrical Gas Station No. (2) | 2012 | Baghdad | 374.820.000 | 
| 120 | Road Works In AL-Mansoryah Gas Power Station | 2012 | Diyala | 2.000.000.000 | 
| 121 | Rehabitation Of Stores And Service Rooms In  AL-Kout Machinery Workshop | 2012 | Wasit | 253.925.000 | 
| 122 | Foundation Works For Internet Building  // SCIS | 2012 | Babil | 328.570.500 | 
| 123 | Water Intake Works In AL-Diwaniyah Gaseous Power Station | 2012 | Diwaniyah | 2.827.475.000 | 
| 124 | Fixing The Coating Of The Fifth Chimney For Electrical Heating Station In Al-Dora | 2012 | Baghdad | 950.000.000 | 
| 125 | Soda Tanks Works Of (4)  In Chemical Industries Company | 2012 | Sacred Karbala | 441.863.500 | 
| 126 | Execution Of Building At The State Company For Internet Services // SCIS | 2012 | Dhi-Qar | 608.168.500 | 
| 127 | Civil Works For Cylinders Repairing Works shop In AL-Nasiryah / 4 | 2012 | Dhi-Qar | 1.986.983.000 | 
| 128 | Civil Works Of Concrete Sleeves And Steel Structure For The Feeding Pipes Of Azmara Unit | 2012 | Baghdad | 1.993.008.000 | 
| 129 | Supplying , installing And Operating Of Water Treatment Unit In AL-Gayarah Refinery | 2012 | Nineveh | 830.000.000 | 
| 130 | Sanitary Works Network In Al-Dora Refinery | 2012 | Baghdad | 2.267.825.000 | 
| 131 | Road Works In AKAZ Gaseous Power Station | 2012 | Anbar | 5.260.387.800 | 
| 132 | Civil Works For Cylinders Repairing Works shop In AL-Nasiryah / 2 | 2012 | Dhi-Qar | 1.988.707.000 | 
| 133 | Execution Of Fence Surrounding Globular Tank In AL-Ramady Gas Foundry \ Gas Filling Company | 2013 | Anbar | 702.270.000 | 
| 134 | Rehabilitation Of Sayedet AL-Najat Church With An Extension Of The Contract No. (1) | 2013 | Baghdad | 2.860.194.500 | 
| 135 | (OSEL) Pipes Works For Azmara Unite | 2013 | Baghdad | 1.565.017.500 | 
| 136 | Execution And Renew Of Fire Fighting Pipes Network In Al-Dora Refinery / 2nd Stage | 2013 | Baghdad | 3.125.796.500 | 
| 137 | Construction Of Mechanicals Building At Production Department In Gas Filling Company | 2013 | Baghdad | 160.371.000 | 
| 138 | Water Intake For AL-Kairat Gaseous Power Station | 2013 | Sacred Karbala | 1.770.000.000 | 
| 139 | Water Intake For AL-Haidaryh Gaseous Power Station | 2013 | Sacred Karbala | 4.712.000.000 | 
| 140 | Earth Filling Of Floor In Middle Euphrates Gas Store | 2013 | Babil | 453.700.000 | 
| 141 | Ministry Of Construction & Housing \ Head Office Building | 2013 | Muthanna | 3.525.545.120 | 
| 142 | Supply Pipes Network For The New Dura Workhouse In Al-Dora Refinery | 2013 | Baghdad | 832.766.175 | 
| 143 | Execution Of Second Floor Laboratory Building Of  The Middle Refinery Company | 2013 | Baghdad | 244.495.000 | 
| 144 | Foundation Works For (8)  H2SO4 Tanks | 2013 | Sacred Karbala | 427.000.000 | 
| 145 | Repairing Cavitations Of AL-Dura Power Station | 2013 | Baghdad | 950.000.000 | 
| 146 | Sand Works And Execution Of Fence For AL-Latifiya Gas Factory | 2013 | Babil | 1.980.924.000 | 
| 147 | Fire Extinguishing Building In AL-Diwaniyah Gas Plant | 2013 | Diwaniyah | 233.213.500 | 
| 148 | Services Building Works For AL-Latifiya Site | 2013 | Babil | 1.248.816.500 | 
| 149 | Execution Of Civil & Mechanical Works For AL-Qa'me Gas Factory In Gas Filling Company | 2013 | Anbar | 746.483.000 | 
| 150 | Pipes Network For The Residential District In Al-Dora Refinery | 2013 | Baghdad | 1.680.600.000 | 
| 151 | Maintenance Of AL-Sarafiya Bridge | 2013 | Baghdad | 420.000.000 | 
| 152 | Execution  Of  The Complete Project For The Infrastructures / University Of Tikrit | 2013 | Salah AL-Din | 6.698.775.000 | 
| 153 | Al- Amiriyah Bridge | 2013 | Anbar | 13.842.645.188 | 
| 154 | Civil And Electromechanical Works In Al Emarah Gas Plant | 2013 | Maysan | 4.573.372.750 | 
| 155 | Execution Of Services Buildings Works In Al-Najaf  Gas Plant | 2013 | Holy Najaf | 1.126.970.200 | 
| 156 | Earth Works And Fence Execution In Al-Najaf  Gas Plant | 2013 | Holy Najaf | 921.915.000 | 
| 157 | Constricting Interchange Bridge And Around For Soda Project | 2013 | Sacred Karbala | 134.000.000 | 
| 158 | Rehabilitation Of The Area Between The Two Holy Shrines In Sacred Karbalaa | 2013 | Sacred Karbala | 4.134.798.000 | 
| 159 | Installation Of Electrical Power Line (2nd Stage) For ZOSS Power Station In AL-Zubair | 2013 | Basra | 1.103.100.000 | 
| 160 | Execution Of A Human Rights National Net Bureau | 2014 | Anbar | 2.064.209.000 | 
| 161 | Execution Of AL-Hila Electrical Gas Station (2) In Abi Garaq | 2014 | Babil | 1.952.159.000 | 
| 162 | Rehabilitation Of Sayedet AL-Najat Church With An Extension Of The Contract No. (2) | 2014 | Baghdad | 602.354.000 | 
| 163 | Execution Of Filling Station In AL-Wasiti District | 2014 | Kirkuk | 1.545.987.000 | 
| 164 | Misan Housing Complex | 2014 | Maysan | 30.976.858.715 | 
| 165 | Execution  Of  Faculty Of Arts / University Of Sacred Karbalaa | 2014 | Sacred Karbala | 6.207.862.500 | 
| 166 | Implementation Of Sewerage And Rain Water Network And Lifting Stations / University Of Sacred Karbalaa | 2014 | Sacred Karbala | 4.475.394.500 | 
| 167 | Execution Of Statistics Sections Training Center In AL-Kufa District | 2014 | Holy Najaf | 2.138.519.000 | 
| 168 | Filling And Secretion The Land Of Political Prisoners Foundation | 2014 | Basra | 2.019.800.000 | 
| 169 | Civil And Electromechanical Works In Aby Ghraib Gas Plant | 2014 | Baghdad | 2.849.953.500 | 
| 170 | Rehabilitation Of Beije Gas Plant Shed | 2014 | Salah AL-Din | 357.525.000 | 
| 171 | Civil , Mechanical And Electrical  Works For Al-Samawa Gas Filling Line | 2014 | Muthanna | 1.369.267.200 | 
| 172 | Execution Of Protection Towers No. (10) For Gas Plants | 2014 | Baghdad ، Babil ، Diwania ، Muthanna ، Maysan | 611.362.000 | 
| 173 | Planning Section  Building | 2014 | Babil | 1.724.405.460 | 
| 174 | Execution Of Project And Engineering Test Section Building In Alforat Alawsat Branch | 2014 | Babil | 440.525.000 | 
| 175 | Boarding Houses / Bab AL- Muadam (1th stage) | 2014 | Baghdad | 9.150.858.600 | 
| 176 | Execution Of National Net For Human Rights Bureau | 2014 | Maysan | 1.887.848.820 | 
| 177 | Construction Of Fence And Scrap Area For Southern Branch | 2014 | Basra | 199.700.000 | 
| 178 | Rehabilitation And Maintenance Of (3) Cooling Towers In AL-Dora Refinery | 2014 | Baghdad | 3.210.000.000 | 
| 179 | Install And Erect AL-Dora Silo | 2014 | Baghdad | 11.738.350.000 | 
| 180 | National Net For Human Rights   Bureau | 2014 | Holy Najaf | 2.166.685.620 | 
| 181 | Construction The Road Of Misan Gas Plant | 2014 | Maysan | 175.000.000 | 
| 182 | Construction Of Six School Class Wings (AL-Furat, AL-Hindiya, AL-Nawadim And The Nawaris Kindergarten) | 2014 | Sacred Karbala | 1.125.493.000 | 
| 183 | Construction Of Specialized Building For Iraqi Researches And Arabic Codes Project | 2014 | Baghdad | 3.388.786.500 | 
| 184 | Design And Implementation Of Printing Machine Building For AL-Sabah Newspaper | 2014 | Baghdad | 4.661.410.156 | 
| 185 | Execution And Renew Of Fire Fighting Pipes Network In Al-Dora Refinery / 3nd Stage | 2014 | Baghdad | 6.850.271.000 | 
| 186 | Earth Works And Fence Execution For Karbala Gas Plant | 2014 | Sacred Karbala | 2.893.460.000 | 
| 187 | National Net For Human Rights   Bureau | 2014 | Diwaniyah | 2.119.560.600 | 
| 188 | Execution Of Rest House Building For Ministry Of Construction And Housing Staff | 2015 | Holy Najaf | 2.594.878.550 | 
| 189 | Construction The Building Of Al-Samawa Police Oil | 2015 | Muthanna | 323.885.000 | 
| 190 | Execution Of institution building of oil production distribution in Middle Euphrates. | 2015 | Babil | 5.073.435.300 | 
| 191 | Ministry Of Construction & Housing \ Head Office Building | 2015 | Kirkuk | 8.885.207.810 | 
| 192 | Establishing Gaseous Generator Piping Plant In AL-Dora Refinery  / Third  Stage | 2015 | Baghdad | 587.969.000 | 
| 193 | Rest House Execution For The Middle Refinery Company / AL-Thaalba | 2015 | Baghdad | 3.041.971.000 | 
| 194 | Civil Works For Oil Mixing And Hydrogen Filtration Unit | 2015 | Baghdad | 1.109.555.000 | 
| 195 | Execution Of Karbala Civil Laboratory Building | 2015 | Sacred Karbala | 3.796.762.009 | 
| 196 | Civil Works For Western Baghdad Power Station Extension | 2015 | Baghdad | 573.525.000 | 
| 197 | Execution Of The Boarding House For Oil Training Institute / 2nd Stage | 2015 | Basra | 6.588.954.000 | 
| 198 | Earth And Civil Works For The Outer Fence And Guards Building For Transforming Stations In Different Sites | 2015 | Several Governorates | 10.099.602.500 | 
| 199 | Construction Of Pumps Foundations In AL-Fao Oil Storage | 2015 | Basra | 2.450.000.000 | 
| 200 | Construction A Fence Surrounding The Housing Complex In Gas Filling Company | 2015 | Baghdad | 796.075.000 | 
| 201 | Rest House Building | 2015 | Dhi-Qar | 2.722.759.293 | 
| 202 | OSBL Pipe Lines For Hydrogen Production Unit | 2016 | Baghdad | 2.062.885.000 | 
| 203 | Misan Maternity Hospital | 2016 | Maysan | 39.783.991.427 | 
| 204 | Construction Of Two Floors Storage Area In AL-Dora Refinery | 2016 | Baghdad | 2.486.175.000 | 
| 205 | Rehabiltation Of Midoil Company Entrance | 2016 | Baghdad | 342.670.000 | 
| 206 | Execution Of A Three Stores Building With Extensions For Midland Oil Company Building | 2016 | Baghdad | 3.815.717.650 | 
| 207 | Excution Of Steam Pipes Net For Oils Unit No.2 | 2016 | Baghdad | 426.044.000 | 
| 208 | Civil And Electromechanical Works For Misan Gas Plant | 2016 | Maysan | 2.826.994.000 | 
| 209 | Construction Of Fence And Sub Road For Dyala Gas Warehouse | 2016 | Diyala | 1.074.565.000 | 
| 210 | Earth Works And Construction Of Outer Road  For Dyala Gas Warehouse | 2016 | Diyala | 1.680.534.000 | 
| 211 | Service And Administration Buildings For Circular Storage Tank | 2016 | Sacred Karbala | 1.594.652.000 | 
| 212 | Civil, Electrical And Mechanical Works For Gas Filling Pipe Line In Najaf Gas Factory | 2016 | Holy Najaf | 1.089.355.000 | 
| 213 | Construction Of Archives Building For The Gas Filling Company In Taji | 2017 | Baghdad | 359.747.000 | 
| 214 | Field Works Of Installation And Construction In Samawa | 2017 | Muthanna | 3.866.552.000 | 
| 215 | Reconstruction Of Imam Ways Bridges No.(4) And No.(7) | 2017 | Diyala | 2.322.968.000 | 
| 216 | Construction Of Concrete Storage Tank In Al-Nasiriya Store | 2017 | Dhi-Qar | 416.980.000 | 
| 217 | Execution Of Welding Works For Steam Pipes, Water Pipes And Air Pipes For Polluted Water Unit Within (3000) inch diagonal welded | 2017 | Baghdad | 60.000.000 | 
| 218 | Reconstruction Of Al-Dhuluiya Big And Small Bridges And Approaches | 2017 | Salah AL-Din | 5.633.169.200 | 
| 219 | Execution Of Welding Works (4000) Inch Diagonal Welded | 2017 | Baghdad | 90.000.000 | 
| 220 | Construction Of Research Department Laboratory In Oil Pipelines Company In AL-Doora Refinery | 2017 | Baghdad | 289.194.000 | 
| 221 | Carbon Steel Pipe (24) inch From River Intake To Cooling Towers | 2017 | Baghdad | 164.830.000 | 
| 222 | Construction Of Financial Department Annix In Gas Filling Company | 2017 | Baghdad | 739.885.000 | 
| 223 | Construction Of Cooling Water Pipe For Light Oil Units (54) | 2017 | Baghdad | 2.738.981.800 | 
| 224 | Construction Of Cooling Water Pipe For Light Oil Units (36) | 2017 | Baghdad | 2.464.820.240 | 
| 225 | Rehabilitation Of Mosul Forth Bridge | 2018 | Nineveh | 1.044.012.000 | 
| 226 | Supplying And Installation Of Pontoon At Euphrates River In Heet Region | 2018 | Anbar | 194.400.000 | 
| 227 | Development Of AL-Kifil Petrol Public Station | 2018 | Babil | 2.241.308.500 | 
| 228 | Paving The Road Of Eight Houses And The Road Parallel To New Buildings In Oil Pipelines Company Headquarters | 2018 | Baghdad | 414.800.000 | 
| 229 | Rehabilitation Of Ground floor In Government Counsil Building | 2018 | Baghdad | 99.980.000 | 
| 230 | Rehabilitation Of Cylinders Preparing Workshop In AL-Kut Factory | 2018 | Wasit | 165.000.000 | 
| 231 | Construction Of Gas Bureau Building In Karbala | 2018 | Sacred Karbala | 1.305.023.950 | 
| 232 | Demolition And Rebuilding Of Al-Shora Secondary School | 2018 | Nineveh | 750.236.000 | 
| 233 | Supply And Operate Two Elevators For AL-Basra Trade Room | 2018 | Basra | 121.200.000 | 
| 234 | Construction Of Brass Store In Gas Filling Company | 2018 | Baghdad | 122.108.000 | 
| 235 | Pouring Reinforced Concrete For A Garage Of Cars And Heavy Machines In Gas Filling Company | 2018 | Baghdad | 167.700.000 | 
| 236 | Rehabilitation Of Al-Alikhani mosque In Daquk | 2018 | Kirkuk | 225.000.000 | 
| 237 | Construction Of Laboratory Building In Holy Najaf Storeroom | 2018 | Holy Najaf | 116.164.000 | 
| 238 | Demolition And Rebuilding Of Al-Ashauis School In Samarra | 2018 | Salah AL-Din | 469.258.000 | 
| 239 | Construction Of Laboratory Building In AL- Nasiriyah Storeroom | 2018 | Dhi-Qar | 117.530.000 | 
| 240 | Rehabilitation Of External Pathways In Council Of State Building | 2018 | Baghdad | 77.257.500 | 
| 241 | Extending Cables For Al-Sumood Refinery In Beji | 2018 | Salah AL-Din | 907.000.000 | 
| 242 | Demolition And Rebuilding Of Al-Saqlawia Industry Preparatory | 2018 | Anbar | 1.311.529.150 | 
| 243 | Construction Of Dhi-Qar Governmental Gas Factory | 2018 | Dhi-Qar | 880.000.000 | 
| 244 | Civil Works Of Tikrit University Boarding Houses | 2018 | Salah AL-Din | 730.462.000 | 
| 245 | Civil Works For Cooling Towers Of AL-Dora Refinery | 2018 | Baghdad | 10.382.616.500 | 
| 246 | Digging a Trench Around The Secure Fence At North Refinery Company Headquarter | 2019 | Salah AL-Din | 644.000.000 | 
| 247 | Supply And Connection Of Plastic Pipes With Fittings For Sanitary Pipeline | 2019 | Baghdad | 244.260.000 | 
| 248 | Execution Of Digging Fluid Channels In Eastern Baghada Oil Field | 2019 | Baghdad | 236.346.000 | 
| 249 | Rehabilitation And Maintainance Of Damaged Buildings Roofs For AL-Sumood Refinery In Beji | 2019 | Salah AL-Din | 537.550.000 | 
| 250 | Supply And Extending Cables For Petrol Improvement Unit And Liquid Unit | 2019 | Salah AL-Din | 1.640.250.000 | 
| 251 | Building Of Seven Stone Border Stations | 2019 | Anbar | 887.390.000 | 
| 252 | Execution Of Boring Piles Works For Three Tanks In Al-Basra Refinery | 2019 | Basra | 6.113.700.000 | 
| 253 | Implementation Of Outer Fence , Earth Filling Works And Guards Room For Power Station | 2019 | Several Governorates | 3.490.077.380 | 
| 254 | Rehabilitation Of  Holy Shrines | 2019 | Babil | 339.619.500 | 
| 255 | Building Of Purchase And Contracts Department At Al Sumood Refinery In Beji | 2019 | Salah AL-Din | 700.655.000 | 
| 256 | Rehabilitation Of Sheds At AL-Samood Refinery | 2019 | Salah AL-Din | 1.482.000.000 | 
| 257 | Construction Of Two-Story's Building For Messan Inspection Branch | 2019 | Maysan | 245.785.000 | 
| 258 | Rehabilitation Of (TBI) Bbilding In Al-Sinak | 2019 | Baghdad | 1.674.420.000 | 
| 259 | Maintainance Of Clay Crusher LO2 | 2019 | Holy Najaf | 42.000.000 | 
| 260 | Demolition And Reconstruction Of AL-Iskandarona School | 2019 | Kirkuk | 557.435.000 | 
| 261 | Rehabilitation Of Boarding Houses At AL-Qadisiya Complex In Mosul University | 2019 | Nineveh | 555.369.000 | 
| 262 | Demolition And Reconstruction Of Jamal Abdulnaser Secondary School | 2019 | Salah AL-Din | 528.360.000 | 
| 263 | Demolition And Reconstruction Of Beji Secondary School | 2019 | Salah AL-Din | 980.658.750 | 
| 264 | Construction Of Bank Building In Al Nasiryah | 2019 | Dhi-Qar | 744.155.000 | 
| 265 | Construction Of Residential Complex In Al-Shatra | 2019 | Dhi-Qar | 29.545.874.027 | 
| 266 | Supply And Extending Electrical Cables For Petrol Improvement And Liquid Gas Units | 2019 | Salah AL-Din | 513.000.000 | 
| 267 | National Net For Human Rights Bureau | 2019 | Sacred Karbala | 2.239.839.750 | 
| 268 | Curing Under Foundations Of Eductional Open College Building | 2020 | Basra | 100.000.000 | 
| 269 | Cleansing Of Paths And Areas From Polluted Soil In Midland Refineries Company | 2020 | Baghdad | 194.392.475 | 
| 270 | Paving Service Road Leading To Fuel Loading Site In Al-Shieba With Road And Yard Of Fuel Loding Site In Khor Al-Zubair | 2020 | Basra | 5.442.195.000 | 
| 271 | Construction Of Al Darrji Bridge | 2020 | Muthanna | 5.019.135.000 | 
| 272 | Kirkuk Water Supply / Second Stage | 2020 | Kirkuk | 93.897.440.000 | 
| 273 | Roads And Bridges Building (Baghdad -Yosifya) | 2020 | Baghdad | 7.385.455.172 | 
| 274 | Construction Of Concrete Tank In Al-Rasafa Storage | 2020 | Baghdad | 161.320.000 | 
| 275 | Supply , Excution And Errection Of Concrete Units (T-Wall) | 2020 | Baghdad | 372.093.000 | 
| 276 | Implementation Of Three Shelters In Al Emarah Storage | 2020 | Maysan | 1.178.100.000 | 
| 277 | Paving Yard And External Roods At AL-Karkh Store | 2020 | Baghdad | 3.240.860.000 | 
| 278 | Demolition And Reconstruction Of Three Police Stations | 2021 | Kirkuk | 508.113.500 | 
| 279 | Plumbing And Carpentry Workshop In Salah AL-Din Refinery | 2021 | Salah AL-Din | 391.115.000 | 
| 280 | Supply And Excution Of Precast Concrete Piles With Two Test Piles In AL-Dorah Refinery | 2021 | Baghdad | 1.562.911.200 | 
| 281 | Design And Execution Of Steel Bridge For Pipes Cross Over In Al-Fatha Zone Between Kirkuk And Salah Al-Din Governorates | 2021 | Salah AL-Din | 2.375.000.000 | 
| 282 | Supply , Extension And Filling Of Electirical Cables For (RO) Unit | 2021 | Salah AL-Din | 324.750.000 | 
| 283 | Rehabilitation Of Work And Social Affairs Ministry Site | 2021 | Baghdad | 1.251.968.500 | 
| 284 | Maintenance And Rehabilitation Of Al-Touz Concrete Bridge | 2021 | Kirkuk | 2.052.790.000 | 
| 285 | Construction Of Three Protection Buildings For AKAZ Oil Field | 2021 | Anbar | 524.850.000 | 
| 286 | Surfacing Of The Road Leading Towards Pumping Unit In Kirkuk Refinery | 2021 | Kirkuk | 448.000.250 | 
| 287 | Dynamic Balance Workshop In Salah AL-Din Refinery | 2021 | Salah AL-Din | 263.692.000 | 
| 288 | Rehabilitation Of Tikrit - Alalam Bridge With Its Approaches | 2021 | Salah AL-Din | 11.519.699.356 | 
| 289 | Demolition And Reconstruction Of Al-Mutasim district And Rehabilition And Maintaince Of Balad Youth Center | 2021 | Salah AL-Din | 782.609.500 | 
| 290 | Construction Of (12) Class School In Al-Nasir Quarter | 2021 | Kirkuk | 589.644.500 | 
| 291 | Civil Works For Two Spherical Tanks In Altaji | 2021 | Baghdad | 1.031.990000 | 
| 292 | Financial Department Building In Salah AL-Din Refinery | 2021 | Salah AL-Din | 2.260.249.640 | 
| 293 | Remaining Works For Al-Hafiz Bridge | 2021 | Dhi-Qar | 1.008.310.000 | 
| 294 | Construction Of Archive Building For Contracts Department In Northern Refineries | 2022 | Salah AL-Din | 424.900.000 | 
| 295 | Demolition And Reconstruction Of Zummar Secondary School And Rehabilitation Of Abu-Khshab School In Rabiaa | 2022 | Nineveh | 739.203.600 | 
| 296 | Building Of Electrial Transformers Reparing Workshop | 2022 | Nineveh | 904.697.550 | 
| 297 | Execution Of Workshop For Cars Gas System Addtion In Al-Taji Gas Factory | 2022 | Baghdad | 869.271.000 | 
| 298 | Construction Of Youth Center In Tallafar (Contract Extension) | 2022 | Nineveh | 1.293.785.000 | 
| 299 | Demoltion And Reconstruction Of Al-Haidarya Fuel Station | 2022 | Holy Najaf | 5.580.985.000 | 
| 300 | Construction Of Study Halls In Al-Hawija Technical Institute | 2022 | Kirkuk | 1.400.697.250 | 
| 301 | Construction Of The Temporary Iron Bridge As An Alternative To The Al-Khidr Bridge | 2022 | Muthanna | 1.521.380.000 | 
| 302 | Maintenance And Rehabilitation Of Cooling Towers In AL-Dorah Refinery | 2023 | Baghdad | 1.783.360.000 | 
| 303 | Construction Of General Materials Sheds In Baiji Refinery Stores | 2023 | Salah AL-Din | 199.950.000 | 
| 304 | Supplying, Extending And Burying Electrical Cables For The Al-Azmarah Unit In Salah Al-Din Refinery (2) | 2023 | Salah AL-Din | 1.230.985.000 | 
| 305 | Construction Of Boarding Houses Builiding In Technical Institute / AL-Hawija | 2023 | Kirkuk | 1.621.773.250 | 
| 306 | Iraqi Housing Fund Building | 2023 | Sacred Karbala | 943.713.000 | 
| 307 | Construction Of A Fixed Iron Bridge Instead Of The Collapsed Sand Bridge | 2023 | Maysan | 1.426.700.000 | 
| 308 | Information Building Of The Ministry Of Construction, Housing, Municipalities And Public Works | 2023 | Baghdad | 391.955.000 | 
| 309 | Execution Of Workshop For Cars Gas System Addtion In Al-Sumood Gas Factory With Supplement | 2023 | Baghdad | 1.499.476.497 | 
| 310 | Restoration Of (7) Schools In Sabaa El-Bour | 2023 | Baghdad | 907.074.000 | 
| 311 | Cathodic Protection System For (LPG) Tanks At The Royal Tulip Al-Rasheed Hotel | 2024 | Baghdad | 88.000.000 | 
| 312 | Supplying, Constructing And Installing A ( BRC) Fence With Bellows Wire On The Iraqi-Iranian Border | 2024 | Maysan | 7.999.992.000 | 
| 313 | Civil And Electromechanical Works Including Materials Supplying, Installation, Operating And Maintenance For Al-Baghdady Water Project | 2024 | Anbar | 45.291.000.185 | 
| 314 | Rehabilitation Of The Securities Commission | 2024 | Baghdad | 540.486.000 | 
| 315 | Completion Of The Steps Halls And Galleries In The Southern Site Of Al-Nahrain University | 2024 | Baghdad | 9.148.466.600 | 
| 316 | Execution Of Haj And Omra Committee Building | 2024 | Holy Najaf | 2.327.097.415 | 
| 317 | State Real Estate Appendix | 2024 | Dhi-Qar | 3.260.512.730 | 
| 318 | Construction Of (18) Class School In Om-Alhawa | 2024 | Sacred Karbala | 1.100.522.000 | 
| 319 | State Real Estate Appendix | 2024 | Diwaniyah | 3.839.642.767 | 
| 320 | Construction Of The Structural Laboratory Building | 2024 | Muthanna | 6.747.846.183 | 
| 321 | Rehabilitation And Maintenance Of The Al-Moufuthea Iron Bridge And The Samawa Concrete Bridge | 2024 | Muthanna | 960.047.500 | 
| 322 | Rehabilitation Of Locality (964), Al-Shumukh Area In The Karrada Municipality | 2024 | Baghdad | 646.980.000 | 
| 323 | Construction Of (18) Class School In Intifadha (2) Quarter | 2024 | Sacred Karbala | 1.414.869.000 | 
| 324 | Establishment Of Schools Number (2) | 2024 | Diwaniyah | 1.292.260.500 | 
| 325 | Rehabilitation Of The Locality (833, 867, 869) In The Municipality Of Al-Rashid | 2024 | Baghdad | 6.096.000.000 | 
| 326 | Constructing A Concrete Wall (T-WALL) With A Bellows Wire On The Iraqi-Syrian Border | 2024 | Nineveh | 15.140.000.000 | 
| 327 | Removing Iron Debris (Scrap) In The Oil District | 2024 | Salah AL-Din | 406.890.000 | 
| 328 | Paving And Road Planning Works Wor The North Refinery, Production Units And The North Energy Site | 2024 | Salah AL-Din | 5.982.075.000 | 
| 329 | Rehabilitation Of The Cooling Towers For The Oil Corporation In The Dora Refinery | 2024 | Baghdad | 2.792.315.000 | 
| 330 | Rehabilitation Of (5) Schools In Hor Rajab And Al-Buaitha | 2024 | Baghdad | 495.070.500 | 
| 331 | Establishment Of A Naffeta Tank In The Pumping And Storage Section Of The Salah Al-Din Refinery | 2024 | Salah AL-Din | 3.704.000.000 | 
| 332 | Preparing And Installing Doors And Windows For Residential Buildings In The Oil District | 2024 | Salah AL-Din | 3.890.200.000 | 
| 333 | Supplementary works for the project of the Chaldean Patriarchate of Babylon building | 2024 | Baghdad | 10.933.082.750 | 
| 334 | Rehabilitation Of Locality (410) Al-Tobji In The Municipality Of Al-Kadhimiya | 2024 | Baghdad | 2.745.264.500 | 
| 335 | Demolition And Reconstruction Of Ammar Bin Yasser School (12) Classrooms In Baiji District | 2024 | Salah AL-Din | 787.544.500 | 
| 336 | Implementation Of Asphalt Roads In The Reservoirs Area Of The Pumping And Storage Division In Salah Al-Din Refinery (2) | 2024 | Salah AL-Din | 4.198.986.000 | 
| 337 | Design, Execution Of Civil And Electromechanically Work For AL-Dujel Water Project | 2025 | Salah AL-Din | 52.766.446.160 | 
| 338 | Establishing An Emergency Tank In The Al-ٍSenea Refinery | 2025 | Salah AL-Din | 3.069.000.000 | 
| 339 | The Central Agency For Standardization And Quality Control | 2025 | Wasit | 16.171.315.615 | 
| 340 | Rehabilitation Of Main And Service Streets And Gardens For The role of Employees In The Dora Refinery | 2025 | Baghdad | 6.204.304.940 | 
| 341 | Alternative Station For The Unified Water Storage And Transmission Lines Of Al-Dujayl | 2025 | Salah AL-Din | 13.100.705.000 | 
| 342 | Construction Of The Al-Khidr Bridge / Secand Stage | 2025 | Muthanna | 4.326.832.000 | 
| 343 | Rehabilitation of Nineveh Hall At Baghdad International Airport | 2025 | Baghdad | 4.086.188.000 | 
| 344 | Excavating And Constructing Sidewalks And Completing Paving Work In The Oil District | 2025 | Salah AL-Din | 6.711.952.500 | 
| 345 | Rehabilitation And Expansion Of Al-Siniyah Refinery | 2025 | Salah AL-Din | 7.600.000.000 | 
| 346 | Medium Voltage Electric Motors In Grease Refinery | 2025 | Salah AL-Din | 6.873.000.000 | 
| 347 | Replacing The Crude Oil Pipeline From The Pumping Station (K2) To The Siniya Refinery | 2025 | Salah AL-Din | 6.580.000.000 | 
| 348 | Rehabilitation Of Schools (9) | 2025 | Maysan | 1.746.143.000 | 
| 349 | Works On Gates And Checkpoints In The City Of AL-Kadhimiya, Numbering (7) | 2025 | Baghdad | 3.026.459.000 | 
| 350 | Construction Of A Tank For Gasoline Products In Salah Al-Din Department (2) / Contract (156) | 2025 | Salah AL-Din | 10.993.950.000 | 
| 351 | Construction Of A Tank For Gasoline Products In Salah Al-Din Department (2) / Contract (160) | 2025 | Salah AL-Din | 10.993.950.000 | 
| 352 | Works In The Chinese Refinery (Extension Of The External Wall, Establishment Of A Maintenance Workshop With An Electric Bridge Crane, Establishment And Renovation Of A Building, Preparation Of A Complete Set Of Pumps With Their Spare Parts, Preparation And Extension Of Pipes For Tanks) | 2025 | Salah AL-Din | 11.370.411.000 | 
| 353 | Rehabilitation Of Presidential Villas (11) With Furnishing | 2025 | Baghdad | 24.579.374.000 | 
| 354 | Developing The Street From Al-Qadisiyah Intersection To Al-Rashid Intersection In The City Of Samarra | 2025 | Salah AL-Din | 5.557.900.000 | 
| 355 | Replacing The Cables Of The Housing Complex In The Doura Refinery | 2025 | Baghdad | 1.868.715.000 | 
| 356 | Preparing, Installing And Operating An Electric Heater With Accessories To Operate The Nitrogen Unit In The Fat Refinery Power Plant | 2025 | Salah AL-Din | 6.500.000.000 | 
| 357 | Establishing Al-Ahrar School (18) Classes In Al-Ahrar District | 2025 | Basra | 1.440.090.000 | 
| 358 | Urban Statistics Section Building | 2025 | Nineveh | 839.425.470 |