Engineer Ya'rab Qahtan Al-Awad, General Manager of Al-Fao General Engineering Company, confirmed the continuation of work on the Central Eastern Hasiba Water Project in Anbar Governorate, which the company is implementing for the General Directorate of Water.
🟢 Project Details:
✅ Production Capacity: (2,000) cubic meters per hour.
✅ Beneficiary Areas: The project serves the residents of eastern Anbar.
🟢 Project Components:
✅ Treatment Plant: Includes three sedimentation tanks, ten filter buildings, a ground tank, chemical buildings, high-pressure and power plants, a workshop, slurry tanks, and two operators' quarters.
✅ Intake Station: Includes a low-pressure and power plant building, along with three transmission lines.
🟢 Current Work:
✅ Detailing And Connecting The Reinforcing Steel: for the foundation of the underground tank, filter building, and collection basin.
✅ Installing The Steel Formwork: for the foundation of the underground tank and filter building.
✅ Brick Construction Work: for the workshop and engineer's offices.
✅ Pipe Preparation: Pipe preparation work is ongoing.