| 1 | 
			Construction Of Low Cost Houses / First Stage | 
			Babil | 
			29.090.721.000 | 
		
| 2 | 
			Construction Of Low Cost Houses / Second Stage | 
			Babil | 
			17.396.467.430 | 
		
| 3 | 
			Execution Of AL-Khalis Housing Complex | 
			Diyala | 
			51.072.113.509 | 
		
| 4 | 
			Reconstruction Of Boarding Houses | 
			Sacred Karbala | 
			7.279.007.000 | 
		
| 5 | 
			Execution of the remaining works of the Jdeidet Al-Shatt water project | 
			Diyala | 
			52.940.742.400 | 
		
| 6 | 
			Establishment Of A Multi-Storey Building Of Five Floors In The Oil Complex | 
			Dhi-Qar | 
			25.609.669.000 | 
		
| 7 | 
			Rehabilitation Of The Entrance To The Abu Ghraib Stores With Buildings And Fences | 
			Baghdad  | 
			8.567.848.000 | 
		
| 8 | 
			Ministry of Planning Buildings Complex | 
			Nineveh | 
			9.022.241.140 | 
		
| 9 | 
			The Housing Complex In Zubaydah | 
			Wasit | 
			101.435.400.000 | 
		
| 10 | 
			Housing Complex Appendix / Al Jazeera (2) | 
			Sacred Karbala | 
			78.749.037.317 | 
		
| 11 | 
			Construction Of The Housing Complex Appendix | 
			Diwaniyah | 
			32.345.385.000 | 
		
| 12 | 
			Low-Cost Role In Al-Numaniyah (Contract Appendix 148) | 
			Wasit | 
			35.000.000.000 | 
		
| 13 | 
			Low-Cost Role In Kut (Contract Appendix 147) | 
			Wasit | 
			65.000.000.000 | 
		
| 14 | 
			The Housing Complex In Al-Azizia | 
			Wasit | 
			69.911.007.524 | 
		
| 15 | 
			Rehabilitation Of The Central Child Hospital | 
			Baghdad  | 
			8.489.824.000 | 
		
| 16 | 
			Establishment Of The Cultural Center In Kadhimiya (Contract Appendix 13 In 2014) | 
			Baghdad  | 
			3.258.033.606 | 
		
| 17 | 
			Establishment Of The Cultural Center (Contract Appendix 14 In 2014) | 
			Muthanna | 
			2.770.677.050 | 
		
| 18 | 
			Prefabricated Building Schools Instead Of Falling Apart ( Kirkuk , Nineveh ) | 
			Nineveh | 
			24.850.568.164 | 
		
| 19 | 
			Rehabilitation Of Jurf Al-Nasr And Al-Diwaniyah Schools, With The Rehabilitation Of (24) Water Circulations | 
			Diwaniyah | 
			2.786.496.000 | 
		
| 20 | 
			Rehabilitation Of Qalat Saleh General Hospital | 
			Maysan | 
			3.204.482.000 | 
		
| 21 | 
			Reconstruction And Rehabilitation Of The Mirbad Government Gas Station | 
			Basra | 
			4.091.014.000 | 
		
| 22 | 
			Establishment Of A Multi-Purpose Sports Hall In The Oil District / Bayji | 
			Salah AL-Din | 
			1.094.467.500 | 
		
| 23 | 
			Demolition And Reconstruction Of Al-Aqsa Mosque School In Sabaa Al-Bour | 
			Baghdad  | 
			2.064.392.900 | 
		
| 24 | 
			Implementation, Equipment, Operation And maintenance Of The Eastern Hasiba Water Project | 
			Anbar | 
			73.817.437.000 | 
		
| 25 | 
			Construction Of (13) Residential Homes In The Oil District | 
			Salah AL-Din | 
			5.982.075.000 | 
		
| 26 | 
			Rehabilitation Of Abu Ghraib General Hospital | 
			Baghdad  | 
			2.706.035.000 | 
		
| 27 | 
			Complementary Works To Establish The National Network For Human Rights Office | 
			Anbar | 
			1.937.702.640 | 
		
| 28 | 
			Construction Of Overhead Stairs Connecting The Tanks Within The Earthen Embankment Leading To Salah Al-Din Refinery | 
			Salah AL-Din | 
			8.347.260.000 | 
		
| 29 | 
			Establishment Of The Human Resources Management Department Building | 
			Salah AL-Din | 
			3.164.040.000 | 
		
| 30 | 
			Establishing The (Dami Water) Line Linking And Transporting Salah Al-Din Energy (1) To Water Transactions (1) And (2) | 
			Salah AL-Din | 
			2.909.550.000 | 
		
| 31 | 
			Developing The Approaches To The Dallah Bridge | 
			Salah AL-Din | 
			5.576.680.000 | 
		
| 32 | 
			Rehabilitation Of Al-Furat General Hospital | 
			Baghdad  | 
			1.142.000.000 | 
		
| 33 | 
			Rehabilitation And Furnishing Of The Ashurbanipal Library And The Institute Of Cuneiform Studies (Contract Annex) | 
			Nineveh | 
			34.392.911.000 | 
		
| 34 | 
			Rehabilitation Of The Road Leading From The Central Information Office To The Entrances To The Old Gate And The Jiki Residential Neighborhood | 
			Salah AL-Din | 
			4.984.031.250 | 
		
| 35 | 
			Construction Of Roofs For The Bus Welcome Areas Inside The Refinery And Oil Neighborhoods | 
			Salah AL-Din | 
			7.555.864.000 | 
		
| 36 | 
			Construction Of A Fuel Oil Production Tank At The Salah Al-Din refinery (2) | 
			Salah AL-Din | 
			14.795.000.000 | 
		
| 37 | 
			Supplying, Installing, And Connecting A Hydrogen Storage Cylinder And Piston System At The Salah Dl-Din Refinery (2) | 
			Salah AL-Din | 
			10.931.320.000 | 
		
| 38 | 
			Rehabilitating (150) Apartments In The Oil District | 
			Salah AL-Din | 
			5.443.990.000 | 
		
| 39 | 
			Construction Of A Power Station Building (MCC) For Power Units In Salah Al-Din Refinery (3) | 
			Salah AL-Din | 
			7.382.780.000 | 
		
| 40 | 
			Equipping Electric Motors (MV) At The Grease Refinery | 
			Salah AL-Din | 
			11.880.000.000 | 
		
| 41 | 
			Equipping Lighting Materials For The Grease Refinery's Production Panels | 
			Salah AL-Din | 
			10.200.000.000 | 
		
| 42 | 
			Complete Rehabilitation Of The Rubber Frame Insulating System For The Oil Tanks With Movable Roofs For Crude Oil Tanks | 
			Salah AL-Din | 
			14.742.500.000 | 
		
| 43 | 
			Completion Of The Administrative Wing Section, Fence, And Courtyards, Along With The Road Leading To The (Naft Neighborhood Intermediate School) | 
			Salah AL-Din | 
			1.338.927.000 | 
		
| 44 | 
			Updating And Designing The Water Exchange System At The Salah Al-Din Refinery (2) | 
			Salah AL-Din | 
			14.478.000.000 | 
		
| 45 | 
			Construction Of A Mixing Tank At The Salah Al-Din Refinery(2) | 
			Salah AL-Din | 
			14.795.000.000 | 
		
| 46 | 
			Construction Of A Crude Oil Tank At The North Refinery | 
			Salah AL-Din | 
			14.795.000.000 | 
		
| 47 | 
			Establishing A Health Center In Abu Shatib Area | 
			Maysan | 
			1.797.345.000 | 
		
| 48 | 
			Establishing A Health Center In The Al Majbas Area | 
			Maysan | 
			1.809.045.000 | 
		
| 49 | 
			Rehabilitation And Development Of Al-Dhaght Street (Kufa And Umm Al-Kubr Neighborhoods Section) | 
			Baghdad  | 
			5.592.950.000 | 
		
| 50 | 
			Rehabilitation And Development Of Alley (3), Entrance To Block (348) In Al-Basatin Neighborhood | 
			Baghdad  | 
			3.774.800.000 | 
		
| 51 | 
			Rehabilitation And Development Of Aden Street (Stage II) | 
			Baghdad  | 
			6.379.570.000 | 
		
| 52 | 
			Rehabilitation And Development Of Fahmi Al-Mudarris Street From Al-Mashateel To Sabah Al-Khayat Square (Stage II) | 
			Baghdad  | 
			5.889.520.000 | 
		
| 53 | 
			Preparation, Implementation, Operation And Maintenance Of Complementary Works For The Balad Water Project | 
			Salah AL-Din | 
			62.973.386.000 | 
		
| 54 | 
			Establishing A Hospital In The Nile District | 
			Babil | 
			29.200.000.000 | 
		
| 55 | 
			Remaining Works For The Ministry Of Planning Building Complex | 
			Baghdad  | 
			7.303.882.051 |